:: Computer Application :: 

Intelligent Systems

Main Chapters

Home
Introduction to Software
Data Structures
System Engineering
Database Management System
Discrete Mathemarics
Numerical & Statistical Computing
Software Engineering
Operation Research
Acounting & Finance
Computer Architecture
Operating Systems
Intelligent Systems
Relational Database
Obejct Oiented Systems

 

Intelligent Systems

 Problems Discussed in this chapter

 
 
 
 
 
 

4. Draw a Pie Chart

5. Probability Calculation

In a bolt factory Machines A, B and C manufacture respectively 25, 35 and 40 percent of the total. Out of their total output 5, 4 and 2 percent are defective. A bolt drawn from the procedure at random is found to be defective. What is the probability that it is manufactured by (i) factory A (ii) factory C ?

6. Binomial Probability Calculation

The Probability that a certain kind of component will survive a given shock test is 2/5. Find the probability that exactly three of the next five components tested will survive, using Binomial Distribution.

7. Calculation or Correlation Coefficient

A computer while calculating correlation coefficient between 25 pairs of two variables and x and y, obtained the following constants :
N=25 x = 125 x2 = 650 y = 100 y2 = 460 xy = 508
A recheck showed that the computer has occupied wrongly two pairs (6,14) and (8,6) of values of (x,y) instead of the correct values (8,12) and (6,8) respectively. Obtain the correct value of the correlation coefficient.

Links for Web Developers Web Publishers

 

Links from Google

 

 
 

Up ]

This is archive of an MCA course completed by BK Pandey. This is published here for the benefit of all visitors.

- Disclaimer -

These articles may treated as study material and veracity of the materials may be checked by the users. Publisher of this material is not responsible for any mistake or error committed in the programming codes in the respective sections.